eng | рус

ETF » ETF Mining Truck

Mining Trucks and Haul Trains with ETF’s have innovative solution for the lowest cost per ton, 12% increased productivity, 5% less trucks required for the job, 25 % less fuel costs, reduction in haul road construction costs and enormous environmental benefits. The chassis of the new mine truck has all-wheel-drive and all-wheel-steer construction with multiple engines. As an idea, major components change in 15 minutes (Engines, tyres, axles 60 minutes). The modular design allows to create a wide range of trucks, with payload 88-240 tons with the 2-5 axes or more. Every component could be different: engines, gearboxes, drivelines, front and rear axles, suspensions, rims, tyres, brakes and frames. ETF developed an innovative solution for the frame: the Monorail frame. Instead of a frame on top of the axles as in competitive vehicles, the ETF frame is between the axles. In order to reduce cost of transportation, all ETF trucks and associated equipment are delivered in standard ISO containers and assembled at your mine site. Another interesting feature - the trucks can be combined into trains, thus increasing the total payload up to 870 tons.

ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining TruckETF Mining TruckETF Mining TruckETF Mining Truck
ETF Mining Truck
  1. steven lawrence
    2011-12-04 05:12:10

    good morning would you be able to e mail a booklet about thies mining truck re motor gearbox and size and other truck dementons thank you

  2. David Hornett
    2012-03-15 01:18:43

    Dear Sir,

    Are any ETF mining trucks operating in Australia as yet? I would like to view the same?

    Yours,

    David Hornett

  3. MARIO VARGAS
    2012-05-06 03:53:48

    Good day. What is the fuel consumption per hour? Maintenance every few hours should be performed and how long? The price of the vehicle it is?

  4. rahul ahire
    2012-06-01 14:05:36

    i like this truck very very much, i also want to ask that when you are launching this tuck.

  5. rafik abbasov
    2013-02-24 23:25:03

    super prosto

  6. Majid Ali
    2013-06-24 10:49:01

    Can I have the performances reports of ETF mining trucks operating ?

Add comment


код

Follow us

Database search

Brand:

Country:

Type:
 

Unknown models:


Do you know? View all »

Recent Comments:

DongFeng goes in Europe with flagship model KX

In Europe is valid Euro 6 emission level and trucks must be fitted speed limiter to 90 kph ;-)

BharatBenz » 2523 / 3123 / 3128 / 4928

Sir, Please send me 12 Wheel truck detail and provide me your price list in Odisha

American LaFrance » 600 Series

I need a windshield frame for a 41 500 series please help

Austin » K30 / K2 / K3 / K4

My K2 has a date moulded into the cylinder head on the side.